Enerveo had full design responsibility for all M&E services.

Key Statistics

Client

Premier Modular Ltd

Location

Taunton

Services

Infrastructure Solutions

Location

Somerset

Value

£13.1m

Duration

2 years (July 2016 - July 2018)

Scope of Works

  • Electrical installation works
  • Power supplies to mechanical equipment
  • New lighting installations
  • Data communications
  • Emergency broadcast system
  • Lightning protection
  • Combined disabled alarm and refuge alarm
  • Hot and cold-water services
  • Above ground drainage
  • Water treatment and commissioning
  • New toilet installations
  • Medical gas installations
  • Air conditioning and heating installation
  • Full catering facility design and installation
  • BMS control system
  • Testing and commissioning

Added Value

The three buildings consisting of circa 800 modules were pre-manufactured, with services installed as far as practically possible in a factory in Yorkshire, before being transported to site for erection. 

Enerveo also prefabricated many of the services via an offsite fabrication specialist, which resulted in a shortened more efficient install programme both in the factory and on site.

Key Facts

The resulting buildings are now housing up to 2,000 full time project staff, and 8,000 workers across the whole construction site, with 24/7 catering for all working on the site.