Scope of Works
Enerveo's involvement included the installation of the site wide HV network and transformers (3.3kV & 11kV) and all the associated pumping terminal and control facilities.
The design was completed by BPA with Enerveo assisting with the site run design for the containment systems and the selection of field junction boxes.
The work scope included (but was not limited to) the following activities:
- Fire and Gas
- Power and Control
- High voltage cabling, termination and testing
- Fibre optic and data communication
- Intrinsically safe, Exe ans Exd systems
- Earthing network
- Road lighting and site-wide lighting
- Cable containment systems
- Instrument small bore tubing
- Pressure testing
- Cable testing
- Energisation testing
- ATEX inspection
- QA Handover dossiers